Progress has been slower that desired, but on par with expected. After glue-up on Day 2 it rained intermittently, permitting no work other than removing the clamps after 24 hours. I was pleasantly surprised that no tell-tale sounds of creaking glue joints occurred. Turning the scallops into a slab As was mentioned in my first […]
Monthly Archives: January 2013
Building the Paul Sellers Workbench – Day 2
As the rain had stopped me before gluing up on Day 1, my goal was to get a lamination finished. Since my stock was still uneven, I went through each board with a straight-edge and jointed them with a No. 5. I hadn’t been very careful when I first smoothed the faces of the boards, […]
Building the Paul Sellers Workbench – Day 1
It is about time I built myself a proper bench; the MDF topped table with no vises is rather limiting. I realized this after falling into the folly myself: building a workbench is one of the largest ‘mind-sinks’ of a starting galoot’s journey. Detailed research into materials, vises, styles, arrangement and types of joinery; on […]